Backfill behind foundation elements, with selected soil from the same excavation by manual means, and compaction in successive lifts of maximum 30 cm thickness with manually guided vibrating tamper, until reaching a dry density not less than 95% of the maximum obtained in the Modified Proctor test, performed according to UNE 103501.
Current Price
24h change
Free for professionals
Create a free account to save, export, and monitor price changes.
No credit card required. 10,676 items in catalog. Free forever.
| Code | ADR025 |
| Category | Rellenos y compactaciones |
| Subcategory | |
| Unit | m³ |
| Resource Type | material |
Free for construction professionals
You're browsing Backfill behind foundation elements anonymously. Create a free account to save items, track price changes, and build project budgets.
Bookmark materials and organize them into project lists.
Get notified by email when prices change on items you track.
Download your selections as Excel or BC3 for estimating.
Full 30-day history across 10,676 catalog items.
No credit card required · Free plan forever · Last updated April 24, 2026
| Last Updated |
| April 24, 2026 |