OOmnicost
  • Pricing
  • Blog
  • Docs
OOmnicost

Simplifying construction project management with real-time data and powerful tools.

Product

  • Catalog
  • AI Estimation
  • BC3 / FIEBDC-3
  • Free estimator
  • Pricing

Company

  • About
  • Blog
  • Developers
  • Help
  • Community
  • Security
  • Contact

Legal

  • Privacy Policy
  • Terms of Service

© 2026 Omnicost. All rights reserved.

PrivacyTerms
Updated continuously from verified suppliers

Construction Material Prices

Real-time pricing for thousands of construction materials, labor rates, and equipment rentals.

Browse by type

Prices aggregated by resource category, refreshed hourly.

  • MaterialsConcrete, steel, lumber, cement, aggregates
  • LaborMasons, electricians, plumbers, operators
  • MachineryExcavators, cranes, mixers, compressors
  • Indirect costsOverhead, safety, permits, waste, insurance
  • Composite itemsMaterial + labor + machinery bundled

Browse by category

Allespacios urbanos64obra nueva2516rehabilitacion75Materials5700Equipment & Machinery Rental6963Labor97Services418Subcontract1577Other46

All Items

24,663 items

Transporte, puesta en obra y retirada de equipo completo para sistema Wellpoint

Sistema Wellpoint

AHW010

3,055.92EUR/ud.
0.00%
24h

Transporte, puesta en obra y retirada de equipo completo de vibroflotación para ejecución de columnas de grava

Columnas de grava

AMG010

5,712.00EUR/ud.
0.00%
24h

Materiales de replanteo

Uncategorized

Gl

10,283.54ARS/gl
0.00%
24h

Ripio Lavado 1/5

Uncategorized

m3

26,115.10ARS/m³
0.00%
24h

Tornillo cabeza Hexagonal

Uncategorized

u

748.16ARS/ud.
0.00%
24h

Tirante Pino 3x3 s/cepillar

Uncategorized

m

1,101.50ARS/m
0.00%
24h

Adhesivos p/ PVC

Uncategorized

Kg

80,966.00ARS/kg
0.00%
24h

Tabla madera 1ra. Pino Nacional

Uncategorized

m2

74,439.23ARS/m²
0.00%
24h

Atióxido rojo plata

Uncategorized

l

32,929.52ARS/l
0.00%
24h

Caja octogonal grande CH.20

Uncategorized

Un

36,107.95ARS/un
0.00%
24h

Oficial

Uncategorized

Hora

505.54ARS/h
0.00%
24h

HYDRAULIC CRANES & EXCAVATORS, CRAWLER MOUNTED - CATERPILLAR 301.5 Caltrans miscellaneous equipment rental rate

Equipment & Machinery Rental

CALTRANS-MISC-EQUIP-HCECL-CAT-3015

12.12USD/hour
0.00%
24h

Transporte, puesta en obra y retirada de equipo completo de perforación para micropozos de bombeo

Pozos de bombeo

AHP105

7.02EUR/ud.
0.00%
24h

DEMOLICIÓN MASIVA M. MANUALES DE PARTICIÓN INTERIOR CITARA L/M

Uncategorized

01ALM90007

11.79EUR/m²
0.00%
24h

Cal

Uncategorized

13ECC

2.56EUR
0.00%
24h

Sistema "PANTALLAX" de muro pantalla de hormigón armado, sin lodos

Sistemas de muros pantalla

CCX010

12.28EUR/m²
0.00%
24h

Sistema de encofrado para muro de sótano

Muros de sotano

CCS020

213.28EUR/m²
0.00%
24h

Pilote barrenado y hormigonado por tubo central de barrena

Pilotes in situ

CPI080

1.22EUR/m
0.00%
24h

Cabeza de anclaje permanente para muro pantalla

Muros pantalla

CCP083

427.68EUR/ud.
0.00%
24h

Sistema de encofrado para viga entre zapatas

Vigas entre zapatas

CAV020

15.82EUR/m²
0.00%
24h