Excavation by trenches, in semi-dry clay soil, until reaching the lower face of the foundation to be backfilled, located at a maximum depth of 0.5 m, with mechanical means, and loading onto a truck or container. Including manual assistance in areas difficult to access for the machinery, cutting of deteriorated areas of the existing foundation and removal of debris.
Current Price
24h change
Free for professionals
Create a free account to save, export, and monitor price changes.
No credit card required. 10,676 items in catalog. Free forever.
| Code | AZA020 |
| Category | Movimiento de tierras |
| Subcategory | |
| Unit | m³ |
| Resource Type | labor |
Free for construction professionals
You're browsing Excavation by trenches, for foundation backfilling anonymously. Create a free account to save items, track price changes, and build project budgets.
Bookmark materials and organize them into project lists.
Get notified by email when prices change on items you track.
Download your selections as Excel or BC3 for estimating.
Full 30-day history across 10,676 catalog items.
No credit card required · Free plan forever · Last updated May 22, 2026
| Last Updated |
| May 22, 2026 |