Reinforced concrete foundation pile of 35 cm diameter, for CPI-8 pile group according to NTE-CPI, up to 15 m depth. Executed by soil drilling, in ground with less than 25 kg/cm² resistance, by mechanical system, without casing, and subsequent continuous dry concreting by pumping through the stem of the drilling tool. Made with HA-25/F/12/XC2 concrete manufactured at batching plant, and poured from truck to stationary pump, and UNE-EN 10080 B 500 S steel, with approximate quantity of 5.6 kg/m. Including binding wire and spacers.
Current Price
24h change
7 Days
0.00%30 Days
0.00%Price Trend
Free for professionals
Create a free account to save, export, and monitor price changes.
No credit card required. 24,662 items in catalog. Free forever.
| Code | CPI080 |
| Category | Pilotes in situ |
| Subcategory | |
| Unit | m |
| Resource Type | unit |
Free for construction professionals
You're browsing Drilled pile concreted through central drill pipe anonymously. Create a free account to save items, track price changes, and build project budgets.
Bookmark materials and organize them into project lists.
Get notified by email when prices change on items you track.
Download your selections as Excel or BC3 for estimating.
Full 30-day history across 24,662 catalog items.
No credit card required · Free plan forever · Last updated July 18, 2026
| Last Updated |
| July 18, 2026 |