F01R090Labor
Waste recycling on site, density 8-15 ton/ha
wasterecyclingdensitysiteheavy
Key Details
- Code
- F01R090
- Public ID
- OC031dfe6824
- Category
- Materials
- Subcategory
- Unit
- ha
- Resource Type
- Labor
- Last Updated
- October 9, 2026
Composition (BC3 recipe)
Components sum €1,336.89 · Unit price €1,337.61/ha
Capataz
O01A020· 3.3 h
€59.30
€17.97/h
3.3 h / 1 ha parent
Peón especializado
O01A060· 3.3 h
€55.87
€16.93/h
3.3 h / 1 ha parent
Astilladora sin mano de obra
M16A030· 8.25 h
€159.56
€19.34/h
8.25 h / 1 ha parent
Motosierra sin mano de obra
M16A440· 3.3 h
€9.54
€2.89/h
3.3 h / 1 ha parent
Tractor cadenas (71/100 cv) D-4
M16A610· 8.25 h
€502.18
€60.87/h
8.25 h / 1 ha parent
Peón ordinario
O01A070· 33 h
€550.44
€16.68/h
33 h / 1 ha parent
Compare across the category
Item pages show one recorded price. The category guides carry the medians, ranges and source counts for Materials.