E13MABA130Material
Hinged cabinet, aggregated panel, hay barnized 1 hour
Key Details
- Code
- E13MABA130
- Public ID
- OC07ae6dd9e0
- Category
- Materials
- Subcategory
- Unit
- m²
- Resource Type
- Material
- Last Updated
- October 10, 2026
Composition (BC3 recipe)
Components sum €298.11 · Unit price €298.11/m²
Oficial primera carpintero
O01BR150· 0.3 h
€5.31
€17.71/h
0.3 h / 1 m² parent
Ayudante carpintero
O01BR160· 0.15 h
€2.58
€17.19/h
0.15 h / 1 m² parent
Precerco de pino 70x35 mm.
P11PP010· 2.9 m
€10.67
€3.68/m
2.9 m / 1 m² parent
Block armario tablero MDF rechapado haya 1h. lisa abatible
P11BA130· 1 ud.
€279.55
€279.55/ud.
1 ud. / 1 m² parent
Compare across the category
Item pages show one recorded price. The category guides carry the medians, ranges and source counts for Materials.