Sign up free
ER-9701(020)Labor

Stablize A Slide Area By Constructing Rip Rap On Slope On Stone Column Foundation, Replace A Stilling Basin, Drainage Repairs, And Other Work.

Stablize A Slide Area By Constructing Rip Rap On Slope On Stone Column Foundation, Replace A Stilling Basin, Drainage Repairs, And Other Work.

sloperepairsconstructionstonecolumnfoundationbasindrainage+2
Key Details
Code
ER-9701(020)
Public ID
OC080adeef2a
Category
Materials
Subcategory
Unit
152514s
Resource Type
Labor
Last Updated
October 10, 2026

Compare across the category

Item pages show one recorded price. The category guides carry the medians, ranges and source counts for Materials.

View Materials price guide
Stablize A Slide Area By Constructing Rip Rap On Slope On Stone Column Foundation, Replace A Stilling Basin, Drainage Repairs, And Other Work. — $645,305.50/152514s · Construction Prices | Omnicost