08CVC00022Labor
Double Ventilation Conduit with Ceramic Blocks
ventilationdoubleblocksceramicconduction
Key Details
- Code
- 08CVC00022
- Public ID
- OC0c1bd17fe2
- Category
- Materials
- Subcategory
- Unit
- m
- Resource Type
- Labor
- Last Updated
- October 11, 2026
Composition (BC3 recipe)
Components sum €23.18 · Unit price €22.35/m
CUADRILLA ALBAÑILERÍA, FORMADA POR OFICIAL 2ª Y PEÓN ESP.
ATC00200· 0.3 h
€13.38
€44.60/h
0.3 h / 1 m parent
MORTERO DE CEMENTO M5 (1:6) CEM II/A-L 32,5 N
AGM00500· 0.021 m³
€1.68
€79.90/m³
0.021 m³ / 1 m parent
CONDUCTO DE VENTILACIÓN DOBLE DE CERÁMICA
IC24300· 1 m
€4.28
€4.28/m
1 m / 1 m parent
REJILLA DE VENTILACION DE ALUMINIO
IC53800· 0.8 ud.
€3.54
€4.42/ud.
0.8 ud. / 1 m parent
PEQUE¥O MATERIAL
WW00400· 1 ud.
€0.30
€0.30/ud.
1 ud. / 1 m parent
Compare across the category
Item pages show one recorded price. The category guides carry the medians, ranges and source counts for Materials.