E18PHJ020Material
Pre-fabricated Semi-beam Concrete T15/30
Key Details
- Code
- E18PHJ020
- Public ID
- OC0f942e6bb3
- Category
- Materials
- Subcategory
- Unit
- m
- Resource Type
- Material
- Last Updated
- October 11, 2026
Composition (BC3 recipe)
Components sum €81.86 · Unit price €81.15/m
Cuadrilla A
O01A090· 0.1 h
€4.32
€43.24/h
0.1 h / 1 m parent
Viga prefabricada de hormigón T15/30cm.
P03EJ020· 1 m
€62.86
€62.86/m
1 m / 1 m parent
Grúa telescópica s/cam. 26-35 t.
M02GE190· 0.055 h
€4.03
€73.30/h
0.055 h / 1 m parent
Puntal telescópico 3m., 1,5 t.
M12CP080· 0.005 ud.
€0.07
€14.19/ud.
0.005 ud. / 1 m parent
ENCOFRADO MADERA JÁCENAS 4 POSTURAS
E05HVE010· 0.3 m²
€10.58
€35.28/m²
0.3 m² / 1 m parent
Compare across the category
Item pages show one recorded price. The category guides carry the medians, ranges and source counts for Materials.