U07DPC025Unit price
Pre-fabricated Deposit 219 m3 Circular Plant
Key Details
- Code
- U07DPC025
- Public ID
- OC16e39124ba
- Category
- Materials
- Subcategory
- Unit
- ud
- Resource Type
- Unit price
- Last Updated
- October 12, 2026
Composition (BC3 recipe)
Components sum €25,957.81 · Unit price €25,957.81/ud
Capataz
O01A020· 12 h
€215.64
€17.97/h
12 h / 1 ud parent
Muro prefabricado de hormigón depósito 220 m3 circular
P03CM140· 94.25 m²
€17,141.25
€181.87/m²
94.25 m² / 1 ud parent
Cubierta hormigón prefabricado circular D=10,00m
P03CF120· 85.6 m²
€5,581.98
€65.21/m²
85.6 m² / 1 ud parent
Pilar prefabricado 40x40 L=3,20 22 piez.
P03CF230· 1 ud.
€1,080.42
€1,080.42/ud.
1 ud. / 1 ud parent
Sellado juntas hormigón prefabricado
P06SI140· 116.99 m
€1,938.52
€16.57/m
116.99 m / 1 ud parent