U03HL230Unit price
Conc. HM/HA-25/B/20/XC2. Slabs V.Bomba Without Reinforcing.
Key Details
- Code
- U03HL230
- Public ID
- OC17887a0079
- Category
- Materials
- Subcategory
- Unit
- m3
- Resource Type
- Unit price
- Last Updated
- October 12, 2026
Composition (BC3 recipe)
Components sum €124.00 · Unit price €125.00/m3
Oficial primera encofradores
O01BE010· 0.125 h
€2.33
€18.63/h
0.125 h / 1 m3 parent
Ayudante encofradores
O01BE020· 0.125 h
€2.23
€17.83/h
0.125 h / 1 m3 parent
Hormigón HA-25/B/20/XC2 central
P01HCA440· 1 m³
€97.00
€97.00/m³
1 m³ / 1 m3 parent
Vibrador hormigón gasolina 75 mm
M10HV080· 0.1 h
€0.24
€2.43/h
0.1 h / 1 m3 parent
Autob.hormig. 56a75 m3, pluma 36m
M01HB021· 1 h
€18.62
€18.62/h
1 h / 1 m3 parent
Desplazamiento autobomba
M01HA040· 0.03 h
€3.58
€119.35/h
0.03 h / 1 m3 parent