AZA030Mixed
Excavation Fill Material, Foundation Backfill
Excavation fill material in foundation backfill, with natural limestone aggregate, and compaction in successive layers of maximum 20 cm thickness with manual-guided vibrating rammer, until achieving a dry density not less than 95% of the maximum obtained in the Proctor Modified test, performed according to UNE 103501.
Key Details
- Code
- AZA030
- Public ID
- OC95c0cce3aa
- Category
- Movimiento de tierras
- Subcategory
- Unit
- m³
- Resource Type
- Mixed
- Last Updated
- August 19, 2026
Composition (BC3 recipe)
Components sum €43.23 · Unit price €43.23/m³
Relleno manual de excavaciones, en recalce de cimientos
— · m³
€43.23
~100%
priced unit (no recipe tree)