Sign up free
AZA030Mixed

Excavation Fill Material, Foundation Backfill

Excavation fill material in foundation backfill, with natural limestone aggregate, and compaction in successive layers of maximum 20 cm thickness with manual-guided vibrating rammer, until achieving a dry density not less than 95% of the maximum obtained in the Proctor Modified test, performed according to UNE 103501.

Key Details
Code
AZA030
Public ID
OC95c0cce3aa
Category
Movimiento de tierras
Subcategory
Unit
m³
Resource Type
Mixed
Last Updated
August 19, 2026
Composition (BC3 recipe)

Components sum €43.23 · Unit price €43.23/m³

  • Relleno manual de excavaciones, en recalce de cimientos

    — · m³

    €43.23

    ~100%

    priced unit (no recipe tree)

Compare across the category

Item pages show one recorded price. The category guides carry the medians, ranges and source counts for Movimiento de tierras.

View Movimiento de tierras price guide

Related Items in Movimiento de tierras