E11WBC010Material
Stone Railing
Key Details
- Code
- E11WBC010
- Public ID
- OCd028ecf13f
- Category
- Materials
- Subcategory
- Unit
- m
- Resource Type
- Material
- Last Updated
- October 10, 2026
Composition (BC3 recipe)
Components sum €418.36 · Unit price €425.01/m
Oficial primera
O01A030· 2.4 h
€42.50
€17.71/h
2.4 h / 1 m parent
AYUDANTE
O01A050· 2.4 h
€34.56
€14.40/h
2.4 h / 1 m parent
Balaustre p.caliza 14x14-h=80cm
P01SC080· 5 ud.
€253.25
€50.65/ud.
5 ud. / 1 m parent
Pasamanos piedra caliza 20x10 cm
P01SC070· 1.06 m
€50.18
€47.34/m
1.06 m / 1 m parent
Base barandilla p. caliza 25x10
P01SC090· 1.06 m
€35.13
€33.14/m
1.06 m / 1 m parent
Cemento CEM II/B-M 32,5 R sacos
P01CC020· 0.001 t
€0.11
€108.56/t
0.001 t / 1 m parent
MORTERO CEMENTO M-5
A01MA050· 0.03 m³
€2.63
€87.57/m³
0.03 m³ / 1 m parent