E02PP010Material
Rock Excavation in Pozos with Explosives
excavationconstructionpozosrocasexplosivos
Key Details
- Code
- E02PP010
- Public ID
- OCeaf43d0a1d
- Category
- Materials
- Subcategory
- Unit
- m³
- Resource Type
- Material
- Last Updated
- July 30, 2026
Composition (BC3 recipe)
Components sum €34.56 · Unit price €35.52/m³
Peón especializado
O01A060· 0.5 h
€8.47
€16.93/h
0.5 h / 1 m³ parent
Peón ordinario
O01A070· 0.45 h
€7.51
€16.68/h
0.45 h / 1 m³ parent
Compresor portátil diesel media presión 2 m3/min
M06CM010· 0.5 h
€1.25
€2.50/h
0.5 h / 1 m³ parent
Barreno dinamita
P01XN030· 2 ud.
€6.50
€3.25/ud.
2 ud. / 1 m³ parent
Retrocargadora neum. 100 CV
M05RN030· 0.21 h
€10.56
€50.30/h
0.21 h / 1 m³ parent
Martillo manual picador neumático hasta 9kg
M06MI110· 0.5 h
€0.27
€0.53/h
0.5 h / 1 m³ parent
Compare across the category
Item pages show one recorded price. The category guides carry the medians, ranges and source counts for Materials.