U16A050Unit price
Destruction of Pre-Existing Concrete Work with Compressor
Key Details
- Code
- U16A050
- Public ID
- OCec8a89a3e8
- Category
- Materials
- Subcategory
- Unit
- m3
- Resource Type
- Unit price
- Last Updated
- August 3, 2026
Composition (BC3 recipe)
Components sum €36.85 · Unit price €61.19/m3
Capataz
O01A020· 0.08 h
€1.44
€17.97/h
0.08 h / 1 m3 parent
Oficial segunda
O01A040· 0.4 h
€6.98
€17.44/h
0.4 h / 1 m3 parent
Peón ordinario
O01A070· 0.8 h
€13.34
€16.68/h
0.8 h / 1 m3 parent
Equipo oxicorte
M11O010· 0.4 h
€2.76
€6.90/h
0.4 h / 1 m3 parent
Compresor portátil diesel alta presión 8 m3/min.
M06CP060· 0.8 h
€4.32
€5.40/h
0.8 h / 1 m3 parent
Martillo manual picador eléctrico hasta 9kg
M06MI020· 0.8 h
€1.52
€1.90/h
0.8 h / 1 m3 parent
Excav.hidr.neumáticos 84 CV
M05EN020· 0.08 h
€3.56
€44.50/h
0.08 h / 1 m3 parent
Camión basculante 4x4 14 t.
M07CB020· 0.08 h
€2.93
€36.65/h
0.08 h / 1 m3 parent