U04NA040Unit price
Artificial Saneo Floor 50 cm.
Key Details
- Code
- U04NA040
- Public ID
- OCeea0839b00
- Category
- Materials
- Subcategory
- Unit
- m2
- Resource Type
- Unit price
- Last Updated
- August 3, 2026
Composition (BC3 recipe)
Components sum €18.49 · Unit price €18.49/m2
Capataz
O01A020· 0.03 h
€0.54
€17.97/h
0.03 h / 1 m2 parent
Peón ordinario
O01A070· 0.03 h
€0.50
€16.68/h
0.03 h / 1 m2 parent
Zahorra artif. ZA(20)/ZA(25) 75%
P01AF820· 1.1 t
€8.35
€7.59/t
1.1 t / 1 m2 parent
Excav.hidr.neumáticos 100 CV
M05EN030· 0.03 h
€1.43
€47.57/h
0.03 h / 1 m2 parent
Camión basculante 4x4 14 t.
M07CB020· 0.06 h
€2.20
€36.65/h
0.06 h / 1 m2 parent
Motoniveladora de 135 CV
M08NM010· 0.015 h
€0.70
€46.65/h
0.015 h / 1 m2 parent
Rodillo vibr.autopr.mixto 15 t.
M08RN040· 0.015 h
€0.49
€32.80/h
0.015 h / 1 m2 parent
Cisterna agua s/camión 10.000 l.
M08CA110· 0.015 h
€0.43
€28.80/h
0.015 h / 1 m2 parent
km transporte zahorra
M07W020· 35 t
€3.85
€0.11/t
35 t / 1 m2 parent