Excavation Well in Place D=100cm. H=2.00m.
- Code
- U14ZMI010
- Public ID
- OCf0d463ff38
- Category
- Materials
- Subcategory
- Unit
- ud
- Resource Type
- Unit price
- Last Updated
- August 3, 2026
Components sum €614.33 · Unit price €612.71/ud
Oficial primera
O01A030· 6 h
€106.26
€17.71/h
6 h / 1 ud parent
Peón especializado
O01A060· 3 h
€50.79
€16.93/h
3 h / 1 ud parent
Hormigón HA-25/B/40/X0 central
P01HCA060· 0.385 m3
€37.35
€97.00/m3
0.385 m3 / 1 ud parent
ME 150X300 ø 5-5 6000X2200 150/150-125/125-300 B500T UNE-EN 10008
P03AM500· 1.539 m²
€5.62
€3.65/m²
1.539 m² / 1 ud parent
Hormigón HM-20/B/40/X0 central
P01HCM001· 1.508 m³
€141.75
€94.00/m³
1.508 m³ / 1 ud parent
Encof. met. anillo pozo D=100 cm
M12EF250· 0.08 m
€50.95
€636.84/m
0.08 m / 1 ud parent
Enco. met. cono pozo (110/60-60)
M12EF210· 0.05 ud.
€20.38
€407.58/ud.
0.05 ud. / 1 ud parent
Pates PP 30x25
P02PW010· 6 ud.
€46.68
€7.78/ud.
6 ud. / 1 ud parent
Cerco/tapa FD/40 junta insonoriz.D=60
P02AC380· 1 ud.
€65.55
€65.55/ud.
1 ud. / 1 ud parent
Excav.hidr.neumáticos 84 CV
M05EN020· 2 h
€89.00
€44.50/h
2 h / 1 ud parent