E07PAC040Material
Transitable Laminate Covering Not Protected 30/60
Key Details
- Code
- E07PAC040
- Public ID
- OCf3415a7ef0
- Category
- Materials
- Subcategory
- Unit
- m²
- Resource Type
- Material
- Last Updated
- July 30, 2026
Composition (BC3 recipe)
Components sum €33.51 · Unit price €37.32/m²
Oficial primera
O01A030· 0.23 h
€4.07
€17.71/h
0.23 h / 1 m² parent
AYUDANTE
O01A050· 0.23 h
€3.31
€14.40/h
0.23 h / 1 m² parent
Lam.LBM(SBS)30-FV(60g/m2)
P06BS090· 2.2 m²
€10.63
€4.83/m²
2.2 m² / 1 m² parent
Fieltro geotextil FP-115g/m2
P06BG050· 1.06 m²
€0.65
€0.61/m²
1.06 m² / 1 m² parent
TABICÓN LADRILLO H/D 25x12x8 cm.
E06DBL060· 0.08 m²
€1.56
€19.49/m²
0.08 m² / 1 m² parent
HORMIG. CELULAR CEM II/B-M 32,5R
A01RS010· 0.1 m³
€11.54
€115.42/m³
0.1 m³ / 1 m² parent
MORTERO CEMENTO M-5
A01MA050· 0.02 m³
€1.75
€87.57/m³
0.02 m³ / 1 m² parent
Compare across the category
Item pages show one recorded price. The category guides carry the medians, ranges and source counts for Materials.