E05HZH030Material
Reinforced Concrete Structure Precast Beam Slab 20+5 4/5m B-50
structurereinforced concreteslabprecast beams20+54/5mb-50
Key Details
- Code
- E05HZH030
- Public ID
- OCf7cc736be5
- Category
- Materials
- Subcategory
- Unit
- m²
- Resource Type
- Material
- Last Updated
- July 30, 2026
Composition (BC3 recipe)
Components sum €86.84 · Unit price €86.84/m²
FORJADO VIGUETA ARMADA SEMIRRESISTENTE 20+5 B50 CERÁMICA
E05HFS010· 1 m²
€54.29
€54.29/m²
1 m² / 1 m² parent
JÁCENA PLANA HA-25/F/20/X0 ENCOFRADO MADERA
E05HVA010· 0.025 m³
€22.18
€887.28/m³
0.025 m³ / 1 m² parent
PILAR HA-25/F/20/X0 ENCOFRADO METÁLICO
E05HSA010· 0.018 m³
€7.43
€412.96/m³
0.018 m³ / 1 m² parent
ZUNCHO PLANO HA-25/F/20/X0 ENCOFRADO MADERA
E05HVA060· 0.004 m³
€2.94
€735.53/m³
0.004 m³ / 1 m² parent