F03C110Unit price
Gavion with Metal Fence, H=0.5 M
Key Details
- Code
- F03C110
- Public ID
- OCfca54bf1a2
- Category
- Materials
- Subcategory
- Unit
- m3
- Resource Type
- Unit price
- Last Updated
- July 31, 2026
Composition (BC3 recipe)
Components sum €114.26 · Unit price €117.64/m3
Peón con plus distancia y capataz
O01A190· 1.65 h
€33.91
€20.55/h
1.65 h / 1 m3 parent
Retrocargo 71/100 CV, cazo 0,9-0,18 m3
M16A530· 1 h
€47.26
€47.26/h
1 h / 1 m3 parent
Gavión 3x1x0,5m (8x10-16) 2,7mm
P41M690· 0.7 ud.
€29.72
€42.46/ud.
0.7 ud. / 1 m3 parent
Alambre (pie de obra)
P41M130· 0.5 kg
€1.00
€1.99/kg
0.5 kg / 1 m3 parent
TRANSPORTE MATERIALES EN OBRA 3-15 KM
F04O830· 1 m³
€2.37
€2.37/m³
1 m³ / 1 m3 parent