Updated continuously from verified suppliers
Construction Material Prices
Real-time pricing for thousands of construction materials, labor rates, and equipment rentals.
Browse by type
Prices aggregated by resource category, refreshed hourly.
Real-time pricing for thousands of construction materials, labor rates, and equipment rentals.
Prices aggregated by resource category, refreshed hourly.
Showing 73,501–73,550 of 80,787 items
| Item | Price | |
|---|---|---|
Air-to-air heat and humidity recovery unit. Wall-mounted installationICR125Sistemas de conduccion de aire | 4,046.77EUR/ud. | |
18IAQ00010Services | 392.01EUR/ud. | |
IEM011Mecanismos | 2.82EUR/ud. | |
01UUB00010Labor | 7.32EUR/ud. | |
IE09700Materials | 337.47EUR/ud. | |
ICQ020Calderas de biomasa | 4,680.46EUR/ud. | |
UGD010Depositos | 3,080.33EUR/ud. | |
NBM020Suelos de madera y laminados | 6.35EUR/m² | |
IBP535Sistema VRF (Toshiba) | 1,837.40EUR/ud. | |
ICT300ICT Unidades de tratamiento de air | 1,220.84EUR/ud. | |
P00404NMaterials | 88.01EUR/ud. | |
08WII00450NMaterials | 32.11EUR/ud. | |
21RVA00030Subcontract | 15.60EUR/m² | |
ECY030Reparaciones | 75.19EUR/m² | |
IF28979Materials | 1.01EUR/m | |
CTDOT-2026-0686015.15 | 95.00USD/l.f. | |
01UUF00010Subcontract | 9.96EUR/ud. | |
IBP519Sistema VRF (Toshiba) | 3,720.32EUR/ud. | |
01IEW00002Subcontract | 7.99EUR/ud. | |
TO02300Labor | 23.17EUR/h | |
18CEE00020Services | 350.00EUR/ud. | |
IBH010Sistema HVRF (Mitsubishi Electric) | 13,882.17EUR/ud. | |
18IBB000501Services | 210.00EUR/ud. | |
IW03140NMaterials | 74.97EUR/ud. | |
RYP006Preparaciones | 13.69EUR/m² | |
ICO190ICO Sistemas de evacuacion de los | 82.32EUR/m | |
ICN102ICN Unidades autonomas de climatiz | 828.01EUR/ud. | |
06ACE00110NSubcontract | 24.72EUR/m² | |
01IER00001Subcontract | 0.46EUR/m | |
21KVS00060Subcontract | 11.45EUR/m² | |
01EBB00220Subcontract | 4.98EUR/m³ | |
IHP110Tuberias de polipropileno | 6.20EUR/m | |
RSN100RSN Juntas en pavimentos continuos | 5.13EUR/m | |
01IFS00009Subcontract | 9.90EUR/ud. | |
08FDP00112SMaterials | 26.14EUR/ud. | |
18KA00060Subcontract | 800.00EUR/ud. | |
004630100Materials | 346.86EUR/ud. | |
RC00160Subcontract | 49.74EUR/m² | |
JDS020Sistemas de anclaje | 74.37EUR/ud. | |
15USM00060Materials | 722.84EUR/ud. | |
21ADS00010Subcontract | 39.94EUR/m² | |
IC579002NMaterials | 35.17EUR/ud. | |
ICR130Sistemas de conduccion de aire | 46.30EUR/ud. | |
IUM010IUM Lineas subterraneas de alta te | 80.53EUR/m | |
M211671-4-2019 | 26.66SGD/tonne | |
18IABBC000501Services | 48.25EUR/ud. | |
21KPS00050Subcontract | 8.73EUR/m | |
RNI020Imprimaciones | 4.07EUR/m² | |
RNI030Imprimaciones | 0.89EUR/m | |
UPG005Vasos mensulas y escaleras | 32.55EUR/m² |