Updated continuously from verified suppliers
Construction Material Prices
Real-time pricing for thousands of construction materials, labor rates, and equipment rentals.
Browse by type
Prices aggregated by resource category, refreshed hourly.
Real-time pricing for thousands of construction materials, labor rates, and equipment rentals.
Prices aggregated by resource category, refreshed hourly.
Showing 17,801–17,850 of 80,787 items
| Item | Price | |
|---|---|---|
Cast iron element N-6 1/2P20MF020 | 13.94EUR/ud. | |
E01EIA080 | 50.07EUR/ud. | |
P21PW070 | 91.34EUR/ud. | |
P01SM023 | 59.35EUR/t | |
M09ME020 | 11.58EUR/h | |
P02DJ110 | 330.92EUR/ud. | |
P08AR110 | 4.69EUR/m | |
15SPD00125Materials | 122.34EUR/ud. | |
C07R034 | 265.26EUR/ud. | |
M01HB020 | 16.25EUR/h | |
06WWT00012Materials | 20.58EUR/m² | |
IM-0052(201) | 610,224.00USD/300520b, 300585a | |
P20VDL500 | 62.38EUR/ud. | |
E05I050 | 89.73EUR/m² | |
P10CH060 | 32.70EUR/ud. | |
E07IWF010 | 19.68EUR/m | |
11WWW00003 | 43.65EUR/ud. | |
STPF-0150(010) | 1,620,054.16USD/215000b | |
IE16075Materials | 2,587.55EUR/ud. | |
E12ETI010 | 244.40EUR/ud. | |
M03AL040 | 243.05EUR/h | |
P32HC340 | 43.37EUR/ud. | |
VDOT-2026-BRISTOL-700SX20-0002 | 153,301.22USD/ea | |
P32EA250 | 91.72EUR/ud. | |
E02PA020 | 31.86EUR/m³ | |
P32WP090 | 60.29EUR/ud. | |
P40C3010 | 45.34EUR/m | |
IM-0823(060) | 403,394.50USD/508207j | |
P19GDA030 | 3,555.15EUR/ud. | |
P08AB140 | 42.90EUR/m² | |
NH-0012(108) | 2,496,034.50USD/401297d, 401299h | |
P12CJ170 | 486.72EUR/m² | |
RL00800Materials | 106.12EUR/m² | |
U09MW410 | 129.64EUR/mes | |
KA03800 | 86.39EUR/m² | |
P04RL020 | 6.13EUR/kg | |
P02TT350 | 176.07EUR/ud. | |
P17CW220 | 1.98EUR/ud. | |
P02RV060 | 4.20EUR/m | |
E13FC010 | 480.29EUR/ud. | |
E06DBYI860 | 64.62EUR/m² | |
P01UJ100 | 3.59EUR/kg | |
E12EMBA230 | 57.97EUR/ud. | |
C04FR060 | 31.12EUR/ud. | |
P19GPC260 | 24.00EUR/ud. | |
P05FW140 | 0.28EUR/ud. | |
E11AE090 | 8.57EUR/m | |
E14MPA040 | 883.49EUR/ud. | |
P02TU410 | 294.55EUR/ud. | |
P29IP025 | 5,092.50EUR/ud. |