Construction Labor in United States

Labor rates for new construction and renovation. Masonry workers, formworkers, rebar installers, electricians, plumbers, painters, equipment operators. Hourly, daily, and per-task data from multiple official cost databases.

Summary β€” United States

Median price

$36.00per hour
$7.18middle half$96.41

Based on 1,880 of 4,744 items β€” those priced per hour. Items in other units are excluded: mixing them would produce a range that means nothing.

Items
4,744
Sources
12

price databases

Modal unit
hour

1,880 items

Last updated
Oct 21, 2026

Recently updated items

Search the full catalog
ItemPer unitPrice
Catch Basins, Type 12, 0' - 4' Depth Tdot 2025 region 1 average awarded unit priceeach$5,647.74
Flexible Pavement Planing Above 2"-4" Vdot statewide February 1, 2024 through March 1, 2026 average unit pricesy$2.52
Nbis Access, Under Bridge Vdot Fredericksburg district February 1, 2024 through March 1, 2026 average unit priceday$2,198.26
Cleaning and Prep of Pave Surfs - Lets Nysdot 2023-2024 region 02 2023Q4 weighted average awarded unit priceeach$50.00
Removal and Disposal of Litter (Year 1) Tdot 2025 region 2 average awarded unit pricelm$203.13
NS Flexible Pavement Planing Vdot statewide February 1, 2024 through March 1, 2026 average unit pricesy$2.16
Construction Surveying MIN.-Plan Vdot Richmond district February 1, 2024 through March 1, 2026 average unit pricels$143,028.06
Engineer'S Field Office - Type 1 Nysdot 2023-2024 region 11 2024Q1 weighted average awarded unit pricemnth$7,000.00
Involuntary Work Suspension Tdot 2025 region 1 average awarded unit priceday$0.67
Relocate Existing Signal Head Vdot Bristol district February 1, 2024 through March 1, 2026 average unit priceea$618.76
Eradicate EX. Linear Pvmt Mrkg Vdot Bristol district February 1, 2024 through March 1, 2026 average unit pricelf$0.30
Jacking and Blocking Beam Vdot Richmond district February 1, 2024 through March 1, 2026 average unit priceea$7,630.68
WZ Traf con Flagging 2LN 2WAY Alt Daily Nysdot 2023-2024 region 04 2023Q4 weighted average awarded unit priceday$1,800.00
Storm Sewer Rock Excavation WisDOT FY 2023 average unit pricecy$101.43
Removal of Portable Drip Irrigation System Nysdot 2023-2024 region 03 2024Q1 weighted average awarded unit priceeach$39.38
Alter Drain Structure, Leach Basins and MHS Nysdot 2023-2024 region 01 2024Q1 weighted average awarded unit priceeach$1,100.00
Remove Store Reset Lscp Appurten, TY 01 Nysdot 2023-2024 region 05 2024Q1 weighted average awarded unit priceeach$1,166.67
Tapping Sleeve with Valve Indot 2025 weighted average unit bid priceeach$10,550.56
Concrete Bases Type 13 WisDOT FY 2023 average unit priceeach$12,709.11
Maintaining Bird Deterrent System (station) WisDOT FY 2023 average unit priceeach$1,350.45
Installation of Stored Bridge Railing Nysdot 2023-2024 region 05 2024Q1 weighted average awarded unit pricem$50.00
Inductance Loop Installation Nysdot 2023-2024 region 10 2024Q1 weighted average awarded unit pricem$29.00
Downguy - Wrap Type Tdot 2025 region 2 average awarded unit priceeach$263.06
Laboratory Building Nysdot 2023-2024 region 01 2024Q1 weighted average awarded unit priceeach$5,600.00
Temporary Plastic Barrier Fence Nysdot 2023-2024 region 01 2023Q3 weighted average awarded unit pricelf$3.75
Planting Deciduous Shrubs - AS Specified Nysdot 2023-2024 region 03 2024Q1 weighted average awarded unit priceeach$120.00
Additional Work Tdot 2025 statewide average awarded unit pricels$972,372.00
Infrared Pothole Repair (Asphalt) Tdot 2025 region 1 average awarded unit pricesf$8.00
LAB Analysis for Hazard Waste Rcra Toxic Nysdot 2023-2024 region 04 2023Q4 weighted average awarded unit priceeach$1,200.00
G.S.E.Pipe (68X13") 525MM DIA, 16 GA Nysdot 2023-2024 region 04 2023Q4 weighted average awarded unit priceeach$380.00
Trans Panel NEW Jersey Barrier Wide Tdot 2025 region 1 average awarded unit priceeach$576.01
Hpbo Corrugated Beam Guide Railing Nysdot 2023-2024 Region 03 2024Q2 Weighted Average Awarded Unit Pricem$52.00
Removal of Substructures Nysdot 2023-2024 region 01 2023Q3 weighted average awarded unit pricecm$192.00
Socketed Line Post W/ALL Accessories Tdot 2025 region 1 average awarded unit priceeach$182.90
Removal of Fence Tdot 2025 region 1 average awarded unit pricelf$20.50
Remove Down GUY Tdot 2025 region 1 average awarded unit priceeach$100.00
Removal of Structures & Obstructions Tdot 2025 region 1 average awarded unit pricels$10,000.00
Core Drilling for Piles (Rock) Tdot 2025 region 1 average awarded unit pricelf$773.62
H.E.S. Patching Type B Vdot Bristol district February 1, 2024 through March 1, 2026 average unit pricesy$1,300.00
Portable Queue Warning System Tdot 2025 region 1 average awarded unit priceday$14,152.17
LAB Test for Soil Phosphorus Concentrate Nysdot 2023-2024 region 04 2023Q4 weighted average awarded unit priceeach$80.00
Removing Structural Steel Sign Supports WisDOT FY 2023 average unit priceeach$332.48
Guide Side Tdot 2025 region 1 average awarded unit priceeach$94.00
Training Tdot 2025 statewide average awarded unit pricels$11,625.00
NS Install Vdot Richmond district February 1, 2024 through March 1, 2026 average unit pricelf$93.00
NS Temp. Pvmt Mrkg Vdot Staunton district February 1, 2024 through March 1, 2026 average unit pricelf$1.95
Production Cold Micromilling Nysdot 2023-2024 region 01 2024Q1 weighted average awarded unit pricesy$1.25
Lamp, Ballast, LED, Switch Disposal by Contractor WisDOT FY 2023 average unit priceeach$62.00
Remove Steel Embedded Traf Signal Pole Nysdot 2023-2024 region 06 2023Q4 weighted average awarded unit priceeach$1,790.00
Retire in Place 4in Serv Cut & Plug Tdot 2025 region 3 average awarded unit priceeach$1,400.00
Hanger Assm.SMB-3, TWO WAY Vdot Bristol district February 1, 2024 through March 1, 2026 average unit priceea$977.54
Barrier Mounted Sign Support (Perf) Tdot 2025 region 2 average awarded unit priceeach$405.00
Removal Pvmt MKG (Double Turning Arrow) Tdot 2025 region 1 average awarded unit priceeach$75.00
1PH Dead END 25KV Tdot 2025 region 2 average awarded unit priceeach$396.75
Structural Lifting Operations - Type A Nysdot 2023-2024 region 01 2024Q1 weighted average awarded unit priceeach$5,000.00
Core Drilling for Piles(Rock) Tdot 2025 statewide average awarded unit pricelf$521.80
Cleaning Existing Pavement and/or Shldrs Nysdot 2023-2024 region 01 2023Q4 weighted average awarded unit pricesqm$0.06
Construction Staking Electrical Installations (project) WisDOT FY 2023 average unit priceeach$3,142.86
Energy Dissipater Tdot 2025 region 1 average awarded unit priceeach$10,000.00
Temporary Marking Removable Mask Out Tape 6-Inch WisDOT FY 2023 average unit pricelf$2.36

The 60 most recently updated of 4,744 items. Each price is in its own unit β€” only compare within the same unit.