Summary — United States

Median price

$1,833.05per each
$437.08middle half$12,350.00

Based on 56 of 423 items — those priced per each. Items in other units are excluded: mixing them would produce a range that means nothing.

Items
423
Sources
14

price databases

Modal unit
each

56 items

Last updated
Sep 5, 2026

Recently updated items

Search the full catalog
ItemPer unitPrice
500000Z, 509004Z500000z, 5090…$1,411,812.50
400610P400610p$2,592,195.85
Stormwater MAN.Drain.STR.SWM-1 Vdot Bristol district February 1, 2024 through March 1, 2026 average unit pricelf$2,350.72
509009M, 509009N, 509009O, 509009P, 509010G509009m, 5090…$1,322,796.25
100942A100942a$2,262,300.40
Bituminous Surface Treatment, Crack & Fog Sealing, Planing Bituminous Pvmt,Paving With Hma, Seeding, Pvmt Markings, Traffic Control And Other Work.602030n, 6020…$6,695,191.67
Acp Overlay And Rehabilitate Reardan Weigh Station600226b, 6002…$922,258.30
Electrical Control System, Transformer - Accessory Jumbo Disconnect -- Main Break Caltrans miscellaneous equipment rental ratehour$1.32
Railing, Kansas Corral 32" W/O Curb Vdot Bristol district February 1, 2024 through March 1, 2026 average unit pricelf$150.00
509002Q, 509010S, 509010T, 509010X, Wahkiak509002q, 5090…$4,251,321.35
Monorail, ONE BAY, QG, G (Qgem) Tdot 2025 region 1 average awarded unit priceeach$276.66
Deck Repair508206c$263,607.00
501205P, 501206I, 501207G, DW Not, Wahkiak501205p, 5012…$996,810.00
Remove Asphalt & Atb, Cc Slab, Cc Ginding, Permanent Signs, And Traffic Control300515a$259,810.95
100575M, Drainage, Surface, Liquid Asphalt, Atb, Ccp, Acp, Landscaping, Signing, And Other Work100575m, dw n…$194,821.00
200204F, 200204M200204f, 2002…$1,396,448.64
Clean & Paint The Chehalis Br 6/123, Niqually River Br7/25 & The Cowlitz River Br 432/10n,And Other Work400601a, 4007…$761,315.00
Cornus Racemosa Gray Dogwood 2'-3' HT. B.B. Ctdot 2026 weighted average unit priceea.$60.59
Vehicle Detector (Radar - Advance) Tdot 2025 region 1 average awarded unit priceeach$12,350.00
200226A, 200235A, 200239A, DW Not, Wahkiak200226a, 2002…$1,706,995.40
401400A, 401499T, 499960S401400a, 4014…$1,852,979.00
639516L, 639516M, 639517I, DW Not, Wahkiak639516l, 6395…$900,260.60
109600C, DW Not109600c, dw n…$312,467.70
209001I, 209032Q, 209733Q209001i, 2090…$4,327,142.00
502202F, 502202G, 502403E, 502404A, 524002H502202f, 5022…$1,327,175.00
153022B, DW Not153022b, dw n…$76,886.00
501207D501207d$3,057,266.40
609029J, 699960E609029j, 6999…$100,130.00
Fog & Crack Seal, Hma Paving, Extruded Curb, Traffic Island Guide Posts, Pavement Markings, Indication Loop Vehicle Detectors, Traffic Control & Other Work620600g$651,915.95
Consists Of Pavng, Crack Seal, Guardrail Pavement Marking, Signing, Traffic Control And Other Work.501213o$732,225.25
Grading, Drainage, Surfacing, Pavement/Acceptance Certificate B, And Other Work.629100f, dw n…$1,800,055.50
Abrasive Blast Cleaning and Field Painting of Structure (Site NO.1) Ctdot 2026 weighted average unit pricels$2,565,086.57
Plane, Crack Seal, Pave W/Acp, Replace Traffic Detector Loops, Perm Signs,Pmt Markers, And Other Work.301640a, 3016…$549,649.13
450491B, DW Not, Wahkiak450491b, dw n…$4,134,253.65
Sign Panel, Furnish & Install Ground Mount, 12-20 SF Fdot statewide 2025/11/01 to 2026/04/30 weighted average unit costea$562.68
102021H, 102021P, 102021T, 102022G, 102023B102021h, 1020…$3,827,259.65
602609G602609g$434,369.40
Engineering Equipment, Total Station - Leica Tcrp1201 W/ PS-R300 T.S.hour$13.71
Hydraulic Personnel Lifts & Aerial Work Platforms - Snorkel-Economy Tba 80 Caltrans miscellaneous equipment rental ratehour$35.09
501701G, DW Not, Wahkiak501701g, dw n…$745,342.60
109054A, DW Not, Wahkiak109054a, dw n…$4,307,632.60
202006A202006a$141,724.00
311221A, DW Not, Wahkiak311221a, dw n…$1,858,128.25
310125B310125b$3,850,950.50
300511S, 301611S300511s, 3016…$569,262.00
300581A, 300582C, 300582E, Wahkiak300581a, 3005…$5,562,356.00
311236A, 311236B311236a, 3112…$3,638,664.75
Mobilization (Interstate & Ctrld Access) Tdot 2025 region 1 average awarded unit priceeach$13,000.00
100260S, 100262A, 100274D100260s, 1002…$1,946,265.00
201700M, 202800C201700m, 2028…$2,758,728.24
140500A, DW Not140500a, dw n…$523,866.50
102022C, 102024A, DW Not, DW Unkn, Wahkiak102022c, 1020…$1,509,691.00
302009A302009a$549,014.00
300813A300813a$699,388.50
316211A, 316213A316211a, 3162…$1,949,408.40
300328A300328a$805,318.00
Drain, Surface, Pave W/Acp Cl B & E, Gr, Perm Sign, Illum, Erosion Control, Gpand Other Work.619504a, dw n…$1,810,194.50
Replace Deteriorating Pccp Panels And Place Asphalt Overlay100518q, 1900…$736,916.57
Prestressed Girder Type I 54W-Inch WisDOT FY 2024 average unit pricelf$292.30
200004E, 202804A, DW Not, Wahkiak200004e, 2028…$1,598,615.50