| 500000Z, 509004Z | 500000z, 5090… | $1,411,812.50 |
| 400610P | 400610p | $2,592,195.85 |
| Stormwater MAN.Drain.STR.SWM-1 Vdot Bristol district February 1, 2024 through March 1, 2026 average unit price | lf | $2,350.72 |
| 509009M, 509009N, 509009O, 509009P, 509010G | 509009m, 5090… | $1,322,796.25 |
| 100942A | 100942a | $2,262,300.40 |
| Bituminous Surface Treatment, Crack & Fog Sealing, Planing Bituminous Pvmt,Paving With Hma, Seeding, Pvmt Markings, Traffic Control And Other Work. | 602030n, 6020… | $6,695,191.67 |
| Acp Overlay And Rehabilitate Reardan Weigh Station | 600226b, 6002… | $922,258.30 |
| Electrical Control System, Transformer - Accessory Jumbo Disconnect -- Main Break Caltrans miscellaneous equipment rental rate | hour | $1.32 |
| Railing, Kansas Corral 32" W/O Curb Vdot Bristol district February 1, 2024 through March 1, 2026 average unit price | lf | $150.00 |
| 509002Q, 509010S, 509010T, 509010X, Wahkiak | 509002q, 5090… | $4,251,321.35 |
| Monorail, ONE BAY, QG, G (Qgem) Tdot 2025 region 1 average awarded unit price | each | $276.66 |
| Deck Repair | 508206c | $263,607.00 |
| 501205P, 501206I, 501207G, DW Not, Wahkiak | 501205p, 5012… | $996,810.00 |
| Remove Asphalt & Atb, Cc Slab, Cc Ginding, Permanent Signs, And Traffic Control | 300515a | $259,810.95 |
| 100575M, Drainage, Surface, Liquid Asphalt, Atb, Ccp, Acp, Landscaping, Signing, And Other Work | 100575m, dw n… | $194,821.00 |
| 200204F, 200204M | 200204f, 2002… | $1,396,448.64 |
| Clean & Paint The Chehalis Br 6/123, Niqually River Br7/25 & The Cowlitz River Br 432/10n,And Other Work | 400601a, 4007… | $761,315.00 |
| Cornus Racemosa Gray Dogwood 2'-3' HT. B.B. Ctdot 2026 weighted average unit price | ea. | $60.59 |
| Vehicle Detector (Radar - Advance) Tdot 2025 region 1 average awarded unit price | each | $12,350.00 |
| 200226A, 200235A, 200239A, DW Not, Wahkiak | 200226a, 2002… | $1,706,995.40 |
| 401400A, 401499T, 499960S | 401400a, 4014… | $1,852,979.00 |
| 639516L, 639516M, 639517I, DW Not, Wahkiak | 639516l, 6395… | $900,260.60 |
| 109600C, DW Not | 109600c, dw n… | $312,467.70 |
| 209001I, 209032Q, 209733Q | 209001i, 2090… | $4,327,142.00 |
| 502202F, 502202G, 502403E, 502404A, 524002H | 502202f, 5022… | $1,327,175.00 |
| 153022B, DW Not | 153022b, dw n… | $76,886.00 |
| 501207D | 501207d | $3,057,266.40 |
| 609029J, 699960E | 609029j, 6999… | $100,130.00 |
| Fog & Crack Seal, Hma Paving, Extruded Curb, Traffic Island Guide Posts, Pavement Markings, Indication Loop Vehicle Detectors, Traffic Control & Other Work | 620600g | $651,915.95 |
| Consists Of Pavng, Crack Seal, Guardrail Pavement Marking, Signing, Traffic Control And Other Work. | 501213o | $732,225.25 |
| Grading, Drainage, Surfacing, Pavement/Acceptance Certificate B, And Other Work. | 629100f, dw n… | $1,800,055.50 |
| Abrasive Blast Cleaning and Field Painting of Structure (Site NO.1) Ctdot 2026 weighted average unit price | ls | $2,565,086.57 |
| Plane, Crack Seal, Pave W/Acp, Replace Traffic Detector Loops, Perm Signs,Pmt Markers, And Other Work. | 301640a, 3016… | $549,649.13 |
| 450491B, DW Not, Wahkiak | 450491b, dw n… | $4,134,253.65 |
| Sign Panel, Furnish & Install Ground Mount, 12-20 SF Fdot statewide 2025/11/01 to 2026/04/30 weighted average unit cost | ea | $562.68 |
| 102021H, 102021P, 102021T, 102022G, 102023B | 102021h, 1020… | $3,827,259.65 |
| 602609G | 602609g | $434,369.40 |
| Engineering Equipment, Total Station - Leica Tcrp1201 W/ PS-R300 T.S. | hour | $13.71 |
| Hydraulic Personnel Lifts & Aerial Work Platforms - Snorkel-Economy Tba 80 Caltrans miscellaneous equipment rental rate | hour | $35.09 |
| 501701G, DW Not, Wahkiak | 501701g, dw n… | $745,342.60 |
| 109054A, DW Not, Wahkiak | 109054a, dw n… | $4,307,632.60 |
| 202006A | 202006a | $141,724.00 |
| 311221A, DW Not, Wahkiak | 311221a, dw n… | $1,858,128.25 |
| 310125B | 310125b | $3,850,950.50 |
| 300511S, 301611S | 300511s, 3016… | $569,262.00 |
| 300581A, 300582C, 300582E, Wahkiak | 300581a, 3005… | $5,562,356.00 |
| 311236A, 311236B | 311236a, 3112… | $3,638,664.75 |
| Mobilization (Interstate & Ctrld Access) Tdot 2025 region 1 average awarded unit price | each | $13,000.00 |
| 100260S, 100262A, 100274D | 100260s, 1002… | $1,946,265.00 |
| 201700M, 202800C | 201700m, 2028… | $2,758,728.24 |
| 140500A, DW Not | 140500a, dw n… | $523,866.50 |
| 102022C, 102024A, DW Not, DW Unkn, Wahkiak | 102022c, 1020… | $1,509,691.00 |
| 302009A | 302009a | $549,014.00 |
| 300813A | 300813a | $699,388.50 |
| 316211A, 316213A | 316211a, 3162… | $1,949,408.40 |
| 300328A | 300328a | $805,318.00 |
| Drain, Surface, Pave W/Acp Cl B & E, Gr, Perm Sign, Illum, Erosion Control, Gpand Other Work. | 619504a, dw n… | $1,810,194.50 |
| Replace Deteriorating Pccp Panels And Place Asphalt Overlay | 100518q, 1900… | $736,916.57 |
| Prestressed Girder Type I 54W-Inch WisDOT FY 2024 average unit price | lf | $292.30 |
| 200004E, 202804A, DW Not, Wahkiak | 200004e, 2028… | $1,598,615.50 |