What are DOT average bid prices?

Checked 2026-11-04

Many state transportation departments publish the average unit price for each pay item from their bid lettings. These reports are free and public, which makes them one of the few open references for US construction unit prices. Omnicost loads the reports of nine DOTs. Each one names its average differently, and that difference matters when you compare.

The reports Omnicost loads

DOTReportEntries in Omnicost
Virginia (VDOT)District Average Bid Prices and Statewide Average Bid Prices4,065 and 1,223
Tennessee (TDOT)Average Unit Prices, awarded contracts4,048
Connecticut (CTDOT)Master Bid Item List2,064
New York (NYSDOT)Weighted Average Item Price Report1,787
Washington (WSDOT)Unit Bid Analysis1,734
Indiana (INDOT)Weighted Average Unit Price Summary1,411
Wisconsin (WisDOT)Average Unit Price List687
Florida (FDOT)Statewide Historical Item Averages614
Texas (TxDOT)Average Low Bid Unit Prices229

Counts as of November 4, 2026. Links to each report are listed in the sources.

What "average" means in each one

The report titles already tell you the method. New York and Indiana publish weighted averages. Texas publishes the average of low bids. Tennessee averages the prices of awarded contracts for the calendar year. Florida publishes historical item averages over a moving window. Comparing a Texas low-bid average with a Tennessee awarded average mixes two different measures, so read each header first.

Quantity changes the unit price

Tennessee's 2025 report shows how much the pay item and quantity matter, even for the same material:

TDOT itemDescriptionStatewide avgQuantity
604-01.32Class A concrete (leveling)$704.72/cy86 cy
604-02.01Class A concrete (box bridges)$916.45/cy7,175 cy
604-03.01Class A concrete (bridges)$1,205.83/cy8,686 cy
611-07.01Class A concrete (pipe endwalls)$2,260.71/cy453.45 cy

Source: TDOT Average Unit Prices, 01JAN2025 thru 31DEC2025, Awarded Contracts.

A checklist for using them

  1. Match the pay item and the unit. "Concrete" alone is too broad.
  2. Note the period printed on the report and the date you pulled it.
  3. Look at the quantity behind the average when the report gives it.
  4. Prefer the district or region figure when the report has one and your job is in that area.
  5. Cite the report, the item number and the period next to every number you reuse.

Sources

Source and observed date. The figures were checked against each source on this date.
SourceObserved dateURL
TDOT Average Unit Prices 20252026-11-04https://www.tn.gov/content/dam/tn/tdot/construction/previous_lettings/Const_aup2025.pdf
VDOT Items and Codes (district and statewide averages)2026-11-04https://www.vdot.virginia.gov/doing-business/technical-guidance-and-support/construction/items-codes/
CTDOT Master Bid Item List2026-11-04https://portal.ct.gov/dot/-/media/dot/aec/cost_estimating/masteritembidlistxlsx.xlsx
NYSDOT Weighted Average Item Price Report2026-11-04https://www.dot.ny.gov/divisions/engineering/design/dqab/dqab-repository/usc_waipr_0723_0624_pdf.pdf
WSDOT Unit Bid Analysis2026-11-04https://wsdot.wa.gov/engineering-standards/design-topics/engineering-applications/unit-bid-analysis
INDOT CY2025 Unit Price Summary2026-11-04https://www.in.gov/indot/doing-business-with-indot/files/CY2025-Unit-Price-Summary.xlsx
WisDOT Average Unit Price List2026-11-04https://wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf
FDOT Statewide Historical Item Averages (6 months)2026-11-04https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/statewide/pdf/historical-item-averages-statewide-6-months.pdf?sfvrsn=47aefe18_8
TxDOT Average Low Bid Unit Prices2026-11-04https://www.dot.state.tx.us/insdtdot/orgchart/cmd/cserve/bidprice/s_0401.htm

How to cite this

State DOT average bid prices: where to find them and how to use them to check an estimate. Omnicost (Ipita LLC). Checked 2026-11-04. /en/guides/state-dot-average-bid-prices. Sources: TDOT Average Unit Prices 2025; VDOT Items and Codes (district and statewide averages); CTDOT Master Bid Item List; NYSDOT Weighted Average Item Price Report; WSDOT Unit Bid Analysis; INDOT CY2025 Unit Price Summary; WisDOT Average Unit Price List; FDOT Statewide Historical Item Averages (6 months); TxDOT Average Low Bid Unit Prices.

Frequently asked questions

What are DOT average bid prices?

Reports in which state transportation departments publish the average unit price bid or awarded for each pay item over a period. They are public and free.

Which states publish them?

Among others, Tennessee, Virginia, Connecticut, New York, Washington, Indiana, Wisconsin, Florida and Texas. Omnicost loads the reports of these nine.

Are all averages calculated the same way?

They differ by report. New York and Indiana publish weighted averages, Texas publishes average low bids and Tennessee averages awarded contracts. Read the report's title and header before comparing states.

How do I use them to check my estimate?

Find the same pay item and unit, check the period and the quantity behind the average, and compare. A small quantity usually means a higher unit price.

Is there an example of how much they vary?

In Tennessee's 2025 report, Class A concrete ranges from $704.72/cy for leveling to $2,260.71/cy for pipe endwalls, statewide.